Unit 21 Dublin Airport Logistics Park

BCL completed the concrete and formwork package on this minor works project on behalf of Walls Construction Ltd. The works included RC foundations, slabs, screeding and dock leveller walls.

Unit 20 Dublin Airport Logistics Park

BCL completed the concrete and formwork package on this minor works project on behalf of Stewart Construction. The works included RC foundations, slabs, screeding and dock leveller walls.

Summerhill Primary Care Centre

BCL carried out the basement bulk excavation, site services and paving on this project. The works also involved the demolition of a pre-existing ESB substation.

Richmond Road Mixed Use Development

This project consists of the construction of 39 no. apartments and 2 no. commercial units over basement car parking, and a new pedestrian/vehicular access road from Richmond Road at the North-West end of the sit

Regional Garda Headquarters, Galway

The project comprises of the construction of a new Garda Regional and Divisional Headquarters building, approximately 11,200m┬▓, with a basement. The development consists of a five storey building with flat roofs along the Dublin Road, stepping down to a single storey, over a lower ground floor, at the rear of the site.

NUI Maynooth Student Housing

The project comprises the construction of new student accommodation in three number courtyard blocks comprising 4 to 9 stories in height with a total gross floor area of c. 9,300m2, including a new stand-alone energy centre.

NUI Maynooth Student Housing

The project comprises the construction of new student accommodation in three number courtyard blocks comprising 4 to 9 stories in height with a total gross floor area of c. 9,300m2, including a new stand-alone energy centre.

Notre Dame des Missions

The development comprises of 261 apartments, duplexes houses in seven new buildings which range in height from three to six storeys. BCL are currently contracted to construct the insitu concrete structure on 6 blocks, which includes 5000m2 of podium slab.

Mylan Pharmaceuticals Expansion

BCL were engaged as the concrete and formwork contractors for the expansion of the Mylan Pharmaceutical facility on a brownfield site adjacent to the existing facility. Ballygormans package included the reinforced concrete elements of the main structure, boundary retaining walls and access roads.

Mylan Pharmaceuticals

BCL were engaged as the concrete and formwork contractors for the expansion of the Mylan Pharmaceutical facility on a brownfield site adjacent to the existing facility.

Lidl Tallaght

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation and ground beam/ Slab construction followed by the reinforced concrete structural elements.