Notre Dame des Missions

The development comprises of 261 apartments, duplexes houses in seven new buildings which range in height from three to six storeys. BCL are currently contracted to construct the insitu concrete structure on 6 blocks, which includes 5000m2 of podium slab.

Richmond Road Mixed Use Development

This project consists of the construction of 39 no. apartments and 2 no. commercial units over basement car parking, and a new pedestrian/vehicular access road from Richmond Road at the North-West end of the sit

Clayton Dublin Airport Hotel

BCL are contracted to carry out demolition and reinforced concrete works on the extension of the Clayton Dublin Airport Hotel. The demolition works mainly consist of confined internal works to the existing structure.

Regional Garda Headquarters, Galway

The project comprises of the construction of a new Garda Regional and Divisional Headquarters building, approximately 11,200m², with a basement. The development consists of a five storey building with flat roofs along the Dublin Road, stepping down to a single storey, over a lower ground floor, at the rear of the site.

Dublin Port Centre

BCL were contracted to construct the new reinforced concrete feature wall and associated works in the Dublin Port Centre. This was an iconic project for Dublin as a whole and one in which BCL are particularly proud of being part of.

Charlemont Regeneration Project – Block 3

This mixed-use development consists of apartments, shops and a community centre. BCL completed the insitu concrete package which includes a large basement split over 2 levels, single sided retaining walls, insitu podium slab, screeds, insitu balconies and rising element

NUI Maynooth Student Housing

The project comprises the construction of new student accommodation in three number courtyard blocks comprising 4 to 9 stories in height with a total gross floor area of c. 9,300m2, including a new stand-alone energy centre.

Kevin Street Garda Station

Project Name: Kevin Street Garda Station Client: JJ Rhatigan & Co Developed by: Office of Public Works (OPW) Location: Dublin City Centre Description: The new Garda Divisional Headquarters consists of a 2-3 storey building with flat roofs along the west boundary, a 5 storey building with flat roof and curved street elevation along the east…

Drogheda Courthouse

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation, ground beams and slab construction followed by the reinforced concrete structure.

Unit 20 Dublin Airport Logistics Park

BCL completed the concrete and formwork package on this minor works project on behalf of Stewart Construction. The works included RC foundations, slabs, screeding and dock leveller walls.

Lidl Tallaght

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation and ground beam/ Slab construction followed by the reinforced concrete structural elements.

Unit 21 Dublin Airport Logistics Park

BCL completed the concrete and formwork package on this minor works project on behalf of Walls Construction Ltd. The works included RC foundations, slabs, screeding and dock leveller walls.

Lidl Cabra

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation and ground beam/ Slab construction followed by the reinforced concrete structural elements.

Summerhill Primary Care Centre

BCL carried out the basement bulk excavation, site services and paving on this project. The works also involved the demolition of a pre-existing ESB substation.

Downpatrick Leisure Centre

BCL were engaged to construct the overall reinforced concrete frame on this Leisure complex. The works included elements of fair faced exposed concrete walls, construction of swimming pool, foundations, insitu concrete slabs and rising elements.

Lidl Donore Road

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation and ground beam/ Slab construction followed by the reinforced concrete structural elements.

Mylan Pharmaceuticals Expansion

BCL were engaged as the concrete and formwork contractors for the expansion of the Mylan Pharmaceutical facility on a brownfield site adjacent to the existing facility. Ballygormans package included the reinforced concrete elements of the main structure, boundary retaining walls and access roads.

Lidl – Gorey

BCL were contracted to undertake both the groundworks and concrete package on this project. The works consisted of site strip, site service installation and ground beam/ Slab construction followed by the reinforced concrete structural elements.

Coolock Primary Care Centre

BCL carried out the hard and soft demolition of the existing building, site strip and excavation, site services and paving on this project. This included a raft slab and subsequent structural screeds.

Charlemont Regeneration Project – Block 3

This mixed-use development consists of apartments, shops and a community centre. BCL completed the insitu concrete package which includes a large basement split over 2 levels, single sided retaining walls, insitu podium slab, screeds, insitu balconies and rising elements.

Kevin Street Garda Station

The new Garda Divisional Headquarters consists of a 2-3 storey building with flat roofs along the west boundary, a 5 storey building with flat roof and curved street elevation along the east boundary and a connecting glazed atrium.